Keyword: emittance
Paper Title Other Keywords Page
TU3I2 Beam Instrumentation, Challenging Tools for Demanding Projects –– a Snapshot from the French Assigned Network diagnostics, instrumentation, network, operation 57
 
  • F. Poirier, T. Durand, C. Koumeir
    Cyclotron ARRONAX, Saint-Herblain, France
  • T. Adam, E. Bouquerel, C. Maazouzi, F.R. Osswald
    IPHC, Strasbourg Cedex 2, France
  • P. Bambade, S.M. Ben Abdillah, N. Delerue, H. Guler
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • B. Cheymol, D. Dauvergne, M.-L. Gallin-Martel, R. Molle, C. Peaucelle
    LPSC, Grenoble Cedex, France
  • L. Daudin, A.A. Husson, B. Lachacinski, J. Michaud
    LP2I, Gradignan, France
  • C. Jamet
    GANIL, Caen, France
  • C. Thiebaux, M. Verderi
    LLR, Palaiseau, France
 
  Particle accelerators are thrusting the exploration of beam production towards several demanding territories, that is beam high intensity, high energy, short time and geometry precision or small size. Accelerators have thus more and more stringent characteristics that need to be measured. Beam diagnostics accompany these trends with a diversity of capacities and technologies that can encompass compactness, radiation hardness, low beam perturbation, or fast response and have a crucial role in the validation of the various operation phases. Their developments also call for specialized knowledge, expertise and technical resources. A snapshot from the French CNRS/IN2P3 beam instrumentation network is proposed. It aims to promote exchanges between the experts and facilitate the realization of project within the field. The network and several beam diagnostic technologies will be exposed. It includes developments of system with low beam interaction characteristics such as PEPITES, fast response detector such as the diamond-based by DIAMMONI, highly dedicated BPM for GANIL-SPIRAL2, emittance-meters which deals with high intensity beams and development for MYRRHA, SPIRAL2-DESIR and NEWGAIN.  
slides icon Slides TU3I2 [6.370 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2022-TU3I2  
About • Received ※ 20 June 2022 — Revised ※ 30 June 2022 — Accepted ※ 10 August 2022 — Issue date ※ 19 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP07 Efficient Heavy Ion Acceleration with High Brilliance rfq, brilliance, cavity, operation 83
 
  • C. Zhang
    GSI, Darmstadt, Germany
  • H. Podlech
    IAP, Frankfurt am Main, Germany
 
  It is challenging to realize an efficient and brilliant RFQ for accelerating high current heavy ion beams, as space charge effects are most pronounced at the low energy end. Here ’efficient’ means an as short as pos-sible accelerating structure with minimum RF power consumption, while ’brilliant’ means high beam transmission and low emittance growth. Using the > 9 m long HSI RFQ accelerator, one of the longest RFQs in the world, as an example, a promising solution has been presented.  
poster icon Poster TUP07 [1.134 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2022-TUP07  
About • Received ※ 21 June 2022 — Accepted ※ 10 August 2022 — Issue date ※ 19 September 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP09 Tuning and RF Measurements of the LILAC RFQ rfq, linac, ion-source, pick-up 90
 
  • H. Podlech
    IAP, Frankfurt am Main, Germany
  • H. Höltermann, H. Hähnel, B. Koubek, U. Ratzinger
    BEVATECH, Frankfurt, Germany
 
  A new linac for the NICA ion collider is under con-struction for JINR at BEVATECH GmbH. As first cavity the 2.5 m long RFQ was manufactured. Within this length it accelerates particles with a mass to charge ratio up to three to an energy of 600 keV/u. The operation frequency is 162.5 MHz and the 4-Rod structure consists of 23 RF cells that need to be adjusted using tuning blocks in order to provide the required field distribution along the electrodes. The status of the manufacturing and the upcoming tuning process including the overall RF setup of the RFQ are summarized in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2022-TUP09  
About • Received ※ 24 June 2022 — Revised ※ 27 June 2022 — Accepted ※ 10 August 2022 — Issue date ※ 19 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP14 Study of Injection Line of the Cyclotrons C70XP of Arronax injection, cyclotron, quadrupole, experiment 100
 
  • T. Durand, R. Bellamy, C. Castel, F. Haddad, C. Koumeir, F. Poirier, H. Trichet
    Cyclotron ARRONAX, Saint-Herblain, France
  • T. Adam, P.G. Graehling, M. Heine, C. Maazouzi, F.R. Osswald
    IPHC, Strasbourg Cedex 2, France
  • F. Haddad
    SUBATECH, Nantes, France
 
  Funding: Work supported by grants from the French National Agency for Research, Arronax-Plus n°ANR-11-EQPX-0004, IRON n°ANR-11-LABX-18-01 and Next n°ANR-16-IDE-0007 and PhD scholarship from the IN2P3/CNRS.
The cyclotron C70XP is an accelerator built for the production of non-conventional radionuclides for nuclear medicine, research in physics, radio-chemistry and biology. Its injection section has been designed for 4 types of ions (HH+, D-, He2+ & H), 3 types of ions reach the end of the beamline (H+, He2+ & D+) at the maximum energy of 70 MeV (H & He2+). It is important that regular and standard runs provide similar beam features with a good emittance quality. An investigation, focused on the beam in the injection, cover beam measurements and potential beam geometry constraints. The beam transverse characteristics in the injection line has been studied with an Allison-type emittance meter and a simple instrumented collimator installed inside the injection line *. With these 2 devices, it is scrutinized how the beam emittance evolves as a function of settings of the injection magnets and the source parameters **. Dependencies found between the emittance, beam hotspots and tunings are discussed, as well as the protection performed by the collimator. Future of this work with a potential collimator design is introduced.
*F.Poirier and al., ’The Injection and Chopper-Based System at Arronax C70XP Cyclotron’
**F. Poirier and al., ’Installation, Use and Follow-Up of an Emittance-Meter at the Arronax Cyclotron 70XP’
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2022-TUP14  
About • Received ※ 21 June 2022 — Revised ※ 27 June 2022 — Accepted ※ 01 July 2022 — Issue date ※ 10 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TH3I1 A Novel CW RFQ for Exotic and Stable Beams rfq, alignment, vacuum, cavity 156
 
  • A. Palmieri, L. Bellan, M. Comunian, L. Ferrari, A. Pisent, C.R. Roncolato
    INFN/LNL, Legnaro (PD), Italy
 
  The SPES RFQ is designed in order to accelerate beams in CW with A/q ratios from 3 to 7 from the Charge Breeder through the MRMS and the selection and injection lines up to the MEBT (Medium Energy Beam Transport). The RFQ is composed of 6 modules about 1.2 m long each. Each module is basically composed of a Stainless Steel Tank and four OFE Copper Electrodes. A copper layer is plated on the tank inner surface and a spring joint between tank and electrode is used in order to seal the RF. In this contribution, the main design steps of the RFQ, the construction concepts and the results obtained for the first assembled modules are shown.  
slides icon Slides TH3I1 [7.615 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2022-TH3I1  
About • Received ※ 20 June 2022 — Revised ※ 28 June 2022 — Accepted ※ 10 August 2022 — Issue date ※ 29 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)